Major Accomplishments of Tri-State Utility Contractors, Inc.  
2001- Cast iron replacement projects in Clarksdale, and Cleveland, Mississippi, replacing about three miles of cast iron, and 200 services, via horizontal directional drilling.  
2002- Blanket contract for Mississippi Valley Gas, installing gas main and services in Tunica, Coahoma, and Bolivar counties in Mississippi.  
2003- Completed a large low pressure replacement in Tupelo, Mississippi, along with numerous directional bores installing approximately 12 miles of water pipe on two other projects.  
2004- Installed gas main in several new subdivisions in Olive Branch, Mississippi along with taking care of all horizontal directional drilling bores.  
2005- Installed gas and fire protection at 3 new schools in DeSoto County, Mississippi.   
2006- An 11 mile water job in DeSoto County, Mississippi.     
2007-  650 ft. of 8” steel horizontal directional drilling bore under Burlington Northern Santa Fe railroad in Olive Branch, Mississippi.210 ft. 24” steel casing and 210 ft. of 12” casing both dry bored and jack under Burlington Northern Santa Fe railroad and Hwy 178 in Olive Branch, Mississippi.340 ft. of 24” steel casing dry bore and jack under Hwy 78 in Olive Branch, and 360 ft. of 12” steel casing installed under Hwy 78 by horizontal directional drilling.220 ft. of 24” steel casing installed under Hwy 12 West in Starkville, Mississippi.  
2008 – 1 mile of 6” STL that passed x-ray bridge replacements of Pe gas line up to 60’ deep in St. Francisville, LA. and a 3 mile main and service PVC replacement in Washington Parrish Gas District.  
2010 – 2014- PVC rise replacements.  Managed a blanket contract for Oxford, MS.  
2012 – A project on the Columbus Air Force Base.  Approximately 3,000 feet 4” and installed approximately 400 gas meters.  
2013 – A FEMA project to replace 1500 gas meters and risers and miscellaneous HP STL creek crossing washouts.  
2014-2015 – Worked for Atmos Energy and Center Point Energy in Mississippi and Louisiana     To learn more about our qualifications you can find us on ISNetworld and Energy World Net. We also have a current contractor’s license in Arkansas, Louisiana, Mississippi, and Tennessee.

2016-2020 Worked for Atmos Energy and Centerpoint Energy in Mississippi and Arkansas. Replacement Projects and new work misc. farm taps and regular stations.

2018 We completed 1,100FT of 6″ STL in Gravel in North MS.

In 2020 Marked our Twentieth year in Business.